"Ultra-fast" is not a standard. No IEC, UL or ISO document defines it, so the number in a product name is a marketing choice rather than a tested specification. What actually decides the outcome is the input current your service must carry, the current the cable can pass without active cooling, and the charge curve of the car that just pulled in.
Read this category as three separate layers: what the cabinet can output, what the dispenser and cable can deliver continuously, and what the vehicle will accept. A 350 kW label describes the first layer only. Projects go wrong when a buyer assumes all three are the same number.
A single 350 kW dispenser draws roughly 500 A per phase at 400 V three-phase before efficiency and power factor are counted. That is not a plug-and-play load: it usually means a dedicated transformer, a service upgrade and a utility interconnection request measured in months, not weeks. Two dispensers sharing one power cabinet do not double that input current — sharing is the entire point of a split system — but three independent 350 kW units on one site do, and at that moment the utility enquiry, not the equipment lead time, sets your opening date.
| Power class | Approx input per phase (400 V, 3-ph) | Cable cooling | Realistic 10–80% session | Where it belongs |
|---|---|---|---|---|
| 150 kW | ~220 A | Air, standard CCS2 cable | 25–40 min | Retail, fleet turnaround, first DC on a site |
| 240 kW | ~350 A | Air or liquid, depends on cable length | 20–32 min | Corridor sites with 800 V vehicles in the mix |
| 350 kW | ~500 A | Liquid-cooled cable in practice | 16–28 min | Highway hubs, 800 V touring cars, truck stops |
| 400 kW+ | ~570 A | Liquid-cooled, split cabinet almost mandatory | 14–26 min, ceiling set by the car | Heavy-duty corridors, MCS-adjacent planning |
Read the third column before the first. Cable cooling, not cabinet rating, sets the continuous current a driver can actually receive: an air-cooled CCS2 cable is limited by conductor temperature long before the cabinet runs out of modules. That is why a "350 kW" installation with a 5 m air-cooled cable often delivers noticeably less than one with an actively cooled cable of the same length.
Liquid cooling buys current density and costs maintenance. A liquid-cooled cable and connector assembly adds pumps, coolant, and a service interval that a site operator must actually honour; an air-cooled dispenser has fewer parts to fail but delivers less continuous current at the same cable gauge. On a low-utilization site, air cooling is usually the better lifecycle decision. On a corridor with back-to-back sessions and a queue, the thermal headroom of a cooled cable is the difference between published and delivered power.
For the site-level view — power sharing topologies, availability, spare-module policy — see fast charging station design. For the commercial arithmetic behind the service upgrade, including demand charges, see commercial charging station planning. Hardware families that match these power classes appear on the split-type modular DC charger and 60–240 kW dual-port DC station pages.