"Ultra-fast" is not a standard. No IEC, UL or ISO document defines it, so the number in a product name is a marketing choice rather than a tested specification. What actually decides the outcome is the input current your service must carry, the current the cable can pass without active cooling, and the charge curve of the car that just pulled in.

Read this category as three separate layers: what the cabinet can output, what the dispenser and cable can deliver continuously, and what the vehicle will accept. A 350 kW label describes the first layer only. Projects go wrong when a buyer assumes all three are the same number.

The input side is where projects die

A single 350 kW dispenser draws roughly 500 A per phase at 400 V three-phase before efficiency and power factor are counted. That is not a plug-and-play load: it usually means a dedicated transformer, a service upgrade and a utility interconnection request measured in months, not weeks. Two dispensers sharing one power cabinet do not double that input current — sharing is the entire point of a split system — but three independent 350 kW units on one site do, and at that moment the utility enquiry, not the equipment lead time, sets your opening date.

Power class Approx input per phase (400 V, 3-ph) Cable cooling Realistic 10–80% session Where it belongs
150 kW ~220 A Air, standard CCS2 cable 25–40 min Retail, fleet turnaround, first DC on a site
240 kW ~350 A Air or liquid, depends on cable length 20–32 min Corridor sites with 800 V vehicles in the mix
350 kW ~500 A Liquid-cooled cable in practice 16–28 min Highway hubs, 800 V touring cars, truck stops
400 kW+ ~570 A Liquid-cooled, split cabinet almost mandatory 14–26 min, ceiling set by the car Heavy-duty corridors, MCS-adjacent planning

Read the third column before the first. Cable cooling, not cabinet rating, sets the continuous current a driver can actually receive: an air-cooled CCS2 cable is limited by conductor temperature long before the cabinet runs out of modules. That is why a "350 kW" installation with a 5 m air-cooled cable often delivers noticeably less than one with an actively cooled cable of the same length.

Three corrections buyers ask for too late

  • Dual-plug does not mean double power. A 360 kW cabinet serving two plugs splits its output. What each plug receives when both are occupied is a documented configuration decision, not a rounding error — see the 360 kW dual-plug CCS2 page for the split modes.
  • The vehicle taper is the real limit. Most current EVs peak well under 200 kW and drop sharply above roughly 60% state of charge. A 400 kW dispenser serving a car that accepts 150 kW is a 150 kW session with a bigger transformer behind it.
  • Transformer sizing is not the sum of nameplate kW. Diversity, simultaneity, charger efficiency and site future load all enter the calculation. Sizing on straight addition produces either an oversized upgrade you cannot justify to finance, or an undersized one that trips on the first cold morning.

Liquid versus air cooling, in operational terms

Liquid cooling buys current density and costs maintenance. A liquid-cooled cable and connector assembly adds pumps, coolant, and a service interval that a site operator must actually honour; an air-cooled dispenser has fewer parts to fail but delivers less continuous current at the same cable gauge. On a low-utilization site, air cooling is usually the better lifecycle decision. On a corridor with back-to-back sessions and a queue, the thermal headroom of a cooled cable is the difference between published and delivered power.

For the site-level view — power sharing topologies, availability, spare-module policy — see fast charging station design. For the commercial arithmetic behind the service upgrade, including demand charges, see commercial charging station planning. Hardware families that match these power classes appear on the split-type modular DC charger and 60–240 kW dual-port DC station pages.

Acceptance items for a high-power site

  • Per-plug continuous output measured at 40 °C ambient, not catalogue peak.
  • Power-sharing table for all occupancy states: both plugs idle, one occupied, both occupied, one tapering.
  • Input current per phase at full output, on the as-built single-line diagram.
  • Transformer kVA calculation with the diversity factor stated numerically.
  • Cable type, length, cooling method, and the continuous ampacity rating documented.
  • Coolant service interval and who performs it, if liquid-cooled.
  • Module failure behaviour: does the site derate, or does it stop?
  • Noise figure at 1 m, because a 350 kW cabinet next to a hotel reception is a complaint waiting to happen.
  • Commissioning record with a load test at rated power for at least 30 minutes per plug.