Elinkpower manufactures and supplies ISO 15118 for OEM and project buyers worldwide. Sampling takes 15–25 days; products carry CE, TUV or ETL certification as applicable, and OCPP 1.6J / 2.0.1 on EV charging models. Related: Car Electric Charging Points, Car Charging Stations Cost, Car Charging Ports, Electric Car Charger Plug.
The sentence "supports ISO 15118-2, upgradeable to -20" appears on a lot of datasheets, and it is usually the most expensive sentence in the document. The two generations are not backward compatible: a unit that will ever need both must run two protocol stacks and negotiate between them at the start of every session.
ISO 15118-20 (2022) is the second-generation network and application layer for vehicle-to-grid communication. It is not a revision of ISO 15118-2 (2014); it is a parallel specification with a different security model, additional service types, and a message set designed for power flowing in both directions.
| Dimension | ISO 15118-2 (2014) | ISO 15118-20 (2022) | Procurement consequence |
|---|---|---|---|
| Security | TLS 1.2, optional; single-direction authentication | TLS 1.3 mandatory, mutual authentication | Certificate handling and crypto capacity become hardware requirements |
| Power direction | Unidirectional charging | Bidirectional power transfer specified (V2G, V2H, V2B) | Protocol support alone does not create a bidirectional product |
| Connection types | Conductive AC and DC | Conductive, wireless power transfer, automatic connection devices | Pantograph and wireless use cases enter the same RFP language |
| Control modes | Scheduled | Scheduled and dynamic | Dynamic tariffs require backend support, not just a charger |
| Contracts | Single contract per session | Multiple concurrent contracts | Fleet and roaming billing models get more complex |
| Interoperability | Baseline for the installed fleet | Not backward compatible; dual-stack negotiation required | A charger serving both fleets must implement both |
Read the last column first. It converts protocol facts into things you can put in a purchase order — processor capacity, secure element, certificate lifecycle, backend capability — and those are the items that decide whether "upgradeable" is true.
In the European Union, AFIR requirements put ISO 15118-2 on new public AC charging points from early 2026, with ISO 15118-20 required for new public and private chargers from 1 January 2027. That creates a specific procurement situation: equipment installed today must serve the existing fleet on -2 while being capable of -20 for compliance and V2G later. Buying only -2 equipment now means a refresh inside two years; buying only -20 equipment means a charger that cannot serve part of today's fleet unless it also implements -2.
Outside the EU the timing differs, but the structural point holds: the practical specification is dual-stack, with the version negotiated per session.
"Firmware upgrade to -20" is usually false at the board level. TLS 1.3 with mutual authentication requires certificate storage and cryptographic capability that many first-generation controller boards do not have. Ask specifically whether the controller has the memory and secure element for -20, and whether a conformance test has been run — not whether the vendor intends to support it.
Protocol support is not bidirectional capability. -20 defines the messages for discharging; the power electronics, isolation, metering in both directions and grid-interconnection approval are separate. A charger advertising "ISO 15118-20" may still be physically unable to export energy. If V2G is the goal, the procurement question is about the whole chain, including the utility interconnection process.
Conformance testing is a bottleneck, not a formality. Full -20 conformance capacity is limited to a small number of laboratories worldwide, and lead times of several months are normal. That belongs in the project schedule next to the utility lead time, not in the week before delivery.